Jump to content

Vectorscript

Peer-to-peer VS development support and exchange

1,878 topics in this forum

    • 2 replies
    • 89 views
    • 1 reply
    • 235 views
    • 3 replies
    • 92 views
    • 1 reply
    • 100 views
    • 1 reply
    • 37 views
    • 4 replies
    • 211 views
    • 4 replies
    • 106 views
    • 3 replies
    • 46 views
    • 2 replies
    • 62 views
    • 7 replies
    • 521 views
    • 12 replies
    • 1,440 views
    • 6 replies
    • 1,493 views
    • 3 replies
    • 103 views
    • 3 replies
    • 77 views
    • 3 replies
    • 53 views
    • 2 replies
    • 96 views
    • 5 replies
    • 130 views
    • 6 replies
    • 94 views
    • 3 replies
    • 91 views
    • 1 reply
    • 82 views
    • 0 replies
    • 68 views
    • 0 replies
    • 61 views
    • 8 replies
    • 148 views
    • 6 replies
    • 147 views
  1. Rebuilding parameter choices list

    • 5 replies
    • 123 views
  • Upcoming Events

  • Posts

    • Hi Gadzooks, thank you for your suggestion, I understand your point of view.   The thing is I don't think I have used any of the Reports, Records, ... before on any project of mine.   So I have not a clear idea and I'd like to understand them. Mainly what is the difference between them and when to use which for what.
      Cheers, Grethe
    • I'm trying to make some simple cubbies (basically just a grid of horizontal and vertical extrudes) using Marionette, but I can't seem to just simply add all of the extrudes together to create a solid addition (so that all of the joint lines won't show).  I've tried using the Solid Boolean node in a variety of ways, but, the best I can do is create four, or more, coincident solids (see attached), when all I want is just one solid.  Is there a node to just simply add solids together, or a way to use the Solid Boolean node to do this?  Thanks! 07-Add Solids-04-00.vwx
    • Bump, I'd like to report this as a bug of sorts, but it's not. Worksheet Database Sub-Row heights can be set individually now, which adds flexibility, except with the drawback that the previous default behaviour has been lost. Maybe this should be moved to the Wish List as a request for some way to restore the previous behaviour? (See below.) Otherwise many Worksheets will have to be edited every time they're introduced into a drawing.       
    • Maybe something like the Eyedropper tool?
    •     Yes however if you are spending a good amount of time creating classes then I would recommend building up s set of standard classes that you use and developing project templates which already have these classes in them.   If you don't always need every class for every project then you can create a "myclasses' file that is kept in the VW user folder Called "standards'. When you want a new class you can then right click on the classes tab of the Nav palette >New class>import and your "my classes" file will appear in a drop down list among a bunch of other default VW standard files. Select your file, choose one or more classes that you want  Done.   If you find yourself often creating the same classes on different projects then this is definitely the way to go. Added benefits are: The class attributes can be set up exactly how you want them. I.e . No further editing is needed the classes can confirm to your class-sub class naming system to seamlessly be incorporated into your project files Standardised classes can be integrated into your symbol library, wall, roof, slab styles etc          

 

    • 7150 Riverwood Drive
    • Columbia, Maryland 21046, USA
    • Contact Us | 410.290.5114

 

  • © 2018 Vectorworks, Inc. All rights reserved.
  • Vectorworks, Inc. is part of the Nemetschek Group.
×