Sadly for the underside of the stairs, I find myself doing some acrobatics too if there is a lot of space between the underside and the actual stair structure
Usually, I leave that part for the CD set, in DD sets I use 2D linework in sections until the design has been ironed out
When, if, the design moves forward then I'll play with Roof faces and wall components to even obtain schedules and BOM