RussU 173 Posted March 31, 2017 There's still an issue with drawing number co-ordination. If I make a sheet, and produce say 6 viewports, each with a label and a number, then all is good. Go and duplicate that sheet and all the viewports will be numbered 7, instead of their original numbers. You can go and amend them manually, but when producing hundreds of sheets, this is an added step to the workflow Quote Share this post Link to post
0 Kevin McAllister 1,147 Posted March 31, 2017 I"m pretty sure its filed as a bug. It really is a frustrating issue. Kevin Quote Share this post Link to post
0 PVA - Jim 2,382 Posted March 31, 2017 VB-139121 - Marked currently as the issue having been identified and a fix is possible but not yet implemented. 1 Quote Share this post Link to post
There's still an issue with drawing number co-ordination.
If I make a sheet, and produce say 6 viewports, each with a label and a number, then all is good.
Go and duplicate that sheet and all the viewports will be numbered 7, instead of their original numbers.
You can go and amend them manually, but when producing hundreds of sheets, this is an added step to the workflow
Share this post
Link to post