shr Posted January 24, 2011 Share Posted January 24, 2011 I have created a door schedule the same as I have created a window schedule, however the door numbers are in no particular order. How can I get them to run in numerical order the way the window schedule does? Some help please Quote Link to comment
Jonathan Pickup Posted January 24, 2011 Share Posted January 24, 2011 if you are talking about the report in the worksheet, you need to sort the number row to get the numbers in order. click on the first row with the numbers, it should have a diamond next to the number, then drag the sort icon to the column. if you have my Vectorworks Essential tutorial manual, you will find instructions on page 226 to do this. 1 Quote Link to comment
shr Posted March 7, 2011 Author Share Posted March 7, 2011 Hi, this method is not working, the diamond is not able to be dragged. Also would like to know why all my windows and windoors don't show up on the window schedule when they are all set too. Quote Link to comment
John Meunier Posted March 8, 2011 Share Posted March 8, 2011 I have attached a vectorworks file of one way we do our door and window schedules for you use, hopefully this helps with some of your questions. Quote Link to comment
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.