Tom Klaber Posted July 12, 2012 Share Posted July 12, 2012 I have been using the door and window scheduling for about a year and I have just encountered an odd problem. When I generate the schedule it duplicates itself 4 times. It is terribly irritating. I know you are going to say that I have duplicate doors or design layers with doors, but that is not the problem. If I go in and change the ID tag of a single door to say"EG999" that single door will show up on the schedule 4 times. Has anybody else encountered this? Thanks, TK Quote Link to comment
bcd Posted July 12, 2012 Share Posted July 12, 2012 It's probably collecting the multiple instances from each viewport. Edit the Criteria and deselect Viewports Quote Link to comment
Tom Klaber Posted July 12, 2012 Author Share Posted July 12, 2012 Thank you. That was it. Quote Link to comment
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.