Jump to content

Door Schedule Duplicated 4 Times


Recommended Posts

I have been using the door and window scheduling for about a year and I have just encountered an odd problem. When I generate the schedule it duplicates itself 4 times. It is terribly irritating.

I know you are going to say that I have duplicate doors or design layers with doors, but that is not the problem. If I go in and change the ID tag of a single door to say"EG999" that single door will show up on the schedule 4 times.

Has anybody else encountered this?

Thanks,

TK

Link to comment

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...