Jump to content

Site Model and Staged Construction


Recommended Posts

I often want to show  a basement construction where the excavation is done in stages, or part of the basement is at a deeper level. Putting a site modifier on top of an existing site modifier does not work. It would be good if you could use a site modifier for the first stage and then use the modified model as the DTM before placing th net site modifier for the second stage etc. Is this possible? If so, how?

Link to comment
  • Vectorworks, Inc Employee

Hello,

Maybe this will help - in the Site Model Settings>General you can choose what layers a Site Modifier is on that can affect the Site Model (SM). In my example I have two layers 'Phase 1' and Phase 2'. 

 

 

 

Screenshot 2023-11-12 at 10.15.39 am.png

 

 

If you update the SM with only the modifiers on 'Phase 1' layer affecting it then create a 'Snapshot'. Likewise then edit the SM and add the 'Phase 2' layer and create another Snapshot. You can then have both snapshots side by side showing what each phase means.

 

 

 

 

Screenshot 2023-11-12 at 10.38.01 am.png

 

 

 

Cheers,

Peter

 

 

  • Like 1
Link to comment

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...