Jump to content

Alignment of the Pasted in Place drawings


Cbeckwith

Recommended Posts

Katie, I have two layers with a building footprint(on layer- Maintenance) that was copied and pasted in place on the second layer (called MedgasZone), with the second layer linked back to the Maintenance layer, but both are not lined up with each other when I preview them in Layers view.

[Roll Eyes]

Link to comment

I'm confused by all your copying and pasting, but have a check for you. Turn off all layers except for the 2 with the plans drawn on them. That way you can see if the "original" plans align with each other. If they don't, you've solved your dilema, and means that the plans aren't drawn acurately. It also sounds like what you are doing is redundant- why don't you use the layer link feature only and skip the copy/pasting of plans from one layer to another. Hope this helps....

[ 11-08-2002, 09:45 AM: Message edited by: jfmarch ]

Link to comment
  • 2 weeks later...

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...