Jump to content
pgorski1984

Braceworks Hoist Connections / Braceworks Bridle

Recommended Posts

Hi!

As I'm new to Vectorworks and Braceworks I have few problems with connections between trusses and hoist. 

 

image.thumb.png.c0fe46802f25abc4af17948205bc2dbe.png

 

Can someone tell me why hoist are visualised like that? If I change any parameter of that hoist by hand in Info Palette - Braceworks says that hoists are not connected. If I connect hoists to trusses - it looks like that and parameters in PIO are completly stupid...

image.thumb.png.9708df8c83cd49694429e2a94e55a50c.png

 

 

Second problem - I have inserted House Rigging Point, set the Allowable Force Z to 1,5kN, connected truss using bridle, calculated the system in Braceworks and... it changes Allowable Force Z to 5 kN which is 3,5kN more than house rigging point can take... Why?

 

Thanks for help

Edited by pgorski1984

Share this post


Link to post

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now

 

7150 Riverwood Drive, Columbia, Maryland 21046, USA   |   Contact Us:   410-290-5114

 

© 2018 Vectorworks, Inc. All Rights Reserved. Vectorworks, Inc. is part of the Nemetschek Group.

×