Jump to content

Braceworks Hoist Connections / Braceworks Bridle


pgorski1984

Recommended Posts

Hi!

As I'm new to Vectorworks and Braceworks I have few problems with connections between trusses and hoist. 

 

image.thumb.png.c0fe46802f25abc4af17948205bc2dbe.png

 

Can someone tell me why hoist are visualised like that? If I change any parameter of that hoist by hand in Info Palette - Braceworks says that hoists are not connected. If I connect hoists to trusses - it looks like that and parameters in PIO are completly stupid...

image.thumb.png.9708df8c83cd49694429e2a94e55a50c.png

 

 

Second problem - I have inserted House Rigging Point, set the Allowable Force Z to 1,5kN, connected truss using bridle, calculated the system in Braceworks and... it changes Allowable Force Z to 5 kN which is 3,5kN more than house rigging point can take... Why?

 

Thanks for help

Edited by pgorski1984
Link to comment

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...