Jump to content

pgorski1984

Member
  • Content Count

    2
  • Joined

  • Last visited

Everything posted by pgorski1984

  1. pgorski1984

    Braceworks Wrong Calculation

    I have problem with Braceworks calculation of very easy system. 3x 3m long PROLYTE H30V Trusses, 2 hoists. 3x trusses weights 62,40 kg When I connect 2 hoists and calculate the system - Braceworks shows Load weight: 54,15 kg If truss weights 62,40 shouldn't Braceworks calculate load weight like 62,40 / 2 = 31,2 kg? See video: Other example: Same truss, same hoists, added 5 loads (200 kg each), calculated the system and it shows Load weight: 801,78 kg per hoist. TRUSS: 62,40 kg Loads: 5x 200 kg TOTAL Load: 1062,40 kg So what's wrong? Is Braceworks an alpha version of software? Today - it should not cost more that 1$ because it's useless.
  2. Hi! As I'm new to Vectorworks and Braceworks I have few problems with connections between trusses and hoist. Can someone tell me why hoist are visualised like that? If I change any parameter of that hoist by hand in Info Palette - Braceworks says that hoists are not connected. If I connect hoists to trusses - it looks like that and parameters in PIO are completly stupid... Second problem - I have inserted House Rigging Point, set the Allowable Force Z to 1,5kN, connected truss using bridle, calculated the system in Braceworks and... it changes Allowable Force Z to 5 kN which is 3,5kN more than house rigging point can take... Why? Thanks for help

 

7150 Riverwood Drive, Columbia, Maryland 21046, USA   |   Contact Us:   410-290-5114

 

© 2018 Vectorworks, Inc. All Rights Reserved. Vectorworks, Inc. is part of the Nemetschek Group.

×