Heather Swift Posted April 20, 2011 Share Posted April 20, 2011 Hello all, I am wanting to enter text into a single cell on a worksheet that I have created that has a database function associated to the entire column. Is this possible in 2011? I used to be able to do this in 2008. Thanks in advance, Heather Quote Link to comment
Pat Stanford Posted April 20, 2011 Share Posted April 20, 2011 If you could do it in VW2008, you should still be able to do it in VW2011. Can you provide a little more information about exactly what you are trying to do and how you are trying to do it so I can try and duplicate it here. Quote Link to comment
Heather Swift Posted April 20, 2011 Author Share Posted April 20, 2011 Sure. I attached the schedule. I am not sure if this is the correct way to set the worksheet up but I have set it up to give those in our office the option to edit the finishes using "spaces" or edit the finishes inside the schedule itself. However, 2011 I cannot add edit the single cells under the columns that have a function (i.e.-=('Space'.'Floor Key') associated to the spaces "assign room finishes" dialog box. Is there a way that I can edit these cells both inside the worksheet and/or inside the space? Quote Link to comment
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.