Jump to content

newbie_ need help to create window schedule


jchan

Recommended Posts

hi all,

I have a drawing which contains 4 different elevations in 4 different designer layers, I use symbols for the windows which attached to a record called "Window record", I want to create an individual window schedule for each elevation, but when I created a window schedule by "create report", I got a full record of all the symbols, I tried to edit it, but it didn't let me to change the content or delete the unwanted cell,

is it a way I can created a selective range of record ( by design layer)? or to edit the report?

thanks in advance,

Jack

Link to comment

Turn on the Database Headers...

Right-click on the Database Row,

Select Edit Criteria,

Set Criteria including "Layer is YOUR DESIGN LAYER #1"

That will do it. Now just be sure you have set all of the column info how you

want it, and formatting font size, etc...

Now duplicate that schedule, edit the duplicate, and edit the criteria to change

it to your next design layer. Repeat for the remaining two.

picture4eb3.png

picture7il6.png

picture8ej2.png

Link to comment

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...