jchan Posted October 6, 2008 Share Posted October 6, 2008 hi all, I have a drawing which contains 4 different elevations in 4 different designer layers, I use symbols for the windows which attached to a record called "Window record", I want to create an individual window schedule for each elevation, but when I created a window schedule by "create report", I got a full record of all the symbols, I tried to edit it, but it didn't let me to change the content or delete the unwanted cell, is it a way I can created a selective range of record ( by design layer)? or to edit the report? thanks in advance, Jack Quote Link to comment
gmm18 Posted October 6, 2008 Share Posted October 6, 2008 Turn on the Database Headers... Right-click on the Database Row, Select Edit Criteria, Set Criteria including "Layer is YOUR DESIGN LAYER #1" That will do it. Now just be sure you have set all of the column info how you want it, and formatting font size, etc... Now duplicate that schedule, edit the duplicate, and edit the criteria to change it to your next design layer. Repeat for the remaining two. Quote Link to comment
jchan Posted October 6, 2008 Author Share Posted October 6, 2008 thank you thank you thank you,gmm18, that's all I need, you save my life Quote Link to comment
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.