Truss square below two mother trusses


Stefan B.

Recommended Posts

Hey,

 

I try to connect a square of trusses below to the trusses above, as the trusses above should lift the square from the roof. The truss cross does not seem to work, it does something but it just alters the vertical distance between them, and no "FLEX" appears and a calculation gives a "not supported" warning. So I tried using drops, with only bridle parts, as there will be no motor between just slings and shackles. I was able to connect two supports but when I tried to connect the third one, I got the error message that the system I want to move(I don't really want to move it but anyways), is already connected and those will be deleted.

 

I tried once more with just one drop connected and tried connecting the truss square on the other side, and that gave the same error. As illustrated below.

 

What is the correct method to connect a structure like this?

 

image.thumb.png.bcad09185fb422e8284364bc1b7a8fc3.png

 

 

 

So, I found a solution to make this work for braceworks, and being able to add truss crosses and FLEX. I moved the supporting trusses so they did not go in parallel directly above the square below but to cross the perpendicular trusses instead. This made is possible to add a FLEX connection. But in reality, I might need or have to have the supporting truss parallel to the truss below and still support it.

Link to comment

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...