Planting Schedule Report by Phase

Recommended Posts

Can anyone help customize a planting schedule report to show plants for a second phase of construction? I think i have seen a tech tip video addressing this, but have looked and cannot find it? Thanks in advance.

Share this post


Link to post

The way I do this is to place the plant objects into different classes. I use "Plants-New-Phase 1" and "Plants-New-Phase 2". In the plant schedule set the database header row(s) criteria to limit the reporting to object of "Plants-New-Phase 1" or 2 depending on what is desired.

Share this post


Link to post

Another method for accomplishing the same thing is to put the plants on separate layers (Phase 1, Phase 2, etc.) and use the criteria to select the appropriate layer.

Share this post


Link to post

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Sign in to follow this  

 

7150 Riverwood Drive, Columbia, Maryland 21046, USA   |   Contact Us:   410-290-5114

 

© 2018 Vectorworks, Inc. All Rights Reserved. Vectorworks, Inc. is part of the Nemetschek Group.

×
×
  • Create New...