Jump to content

Room Finish Schedule oddity


rcarch

Recommended Posts

I have been working with the room finishes, the space tool and the room finish library/schedule. Most everything works as I would expect it to, until I come to the two way aspect of the schedule. If I make an edit in the schedule to a particular finish designation, it changes it there on the schedule, but does not link the edit back to the Space itself. Therefore, when I next go into the Space OIP, to edit finishes thru there, the item that I changed in the schedule reverts back to whatever the setting in the OIP is (assuming that I do not update it in the OIP too). I think this might be a small oversight in the coding. I would imagine it should work just like the windows and doors do.

If I edit the name of the space, or the room number of the space though, they do change in the space OIP, so that works rather nicely.

Also, while we are at it with the room finish schedule, could the room finish legend also have a live link to the room finish schedule, so that I would not have to re-create it every time the finish schedule changes? Right now, it still creates a static worksheet. Just a thought!

Link to comment

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...