I am learning how to generate reports on Vectorworks 2024 and I can't find a way to show in a door schedule (report) a double door information.
Usually I would describe a double door 6'-0" as (2) 3'-0" or unequal door as (1) 3-0 + (1) 2-0 for example.
Is there a way to have the self generating door schedule report to include this type of information ?
I could not find an easy way to solve this issue - I tried to display Leaf 1 and Leaf 2 but I experienced odd glitches and frankly it appears it is a very convoluted way to display a very basic information that should be "built in" to any schedule.
You can post now and register later.
If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.
Question
Lorenzo Antinori
Hello everyone,
I am learning how to generate reports on Vectorworks 2024 and I can't find a way to show in a door schedule (report) a double door information.
Usually I would describe a double door 6'-0" as (2) 3'-0" or unequal door as (1) 3-0 + (1) 2-0 for example.
Is there a way to have the self generating door schedule report to include this type of information ?
I could not find an easy way to solve this issue - I tried to display Leaf 1 and Leaf 2 but I experienced odd glitches and frankly it appears it is a very convoluted way to display a very basic information that should be "built in" to any schedule.
Am I missing anything ?
Thank you so much!
Lorenzo
Link to comment
0 answers to this question
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.