I've attempted to used the 'Title Block Manager" to change multiple sheet revisions but it says that there are "No title block border objects detected".
All of our office templates use title block symbols, which can have some mass control for copying project data to all active sheets etc.
The major PITA is having to individually drill down into each title block to change revision data. Yes you can apply a new revision to all the sheets (or a selected list), but what if I want to delete an erroneous revision? Or start fresh for issuing 'For Construction' drawings with numbers instead of letters?
You can post now and register later.
If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.
Question
DSmith2300
I've attempted to used the 'Title Block Manager" to change multiple sheet revisions but it says that there are "No title block border objects detected".
All of our office templates use title block symbols, which can have some mass control for copying project data to all active sheets etc.
The major PITA is having to individually drill down into each title block to change revision data. Yes you can apply a new revision to all the sheets (or a selected list), but what if I want to delete an erroneous revision? Or start fresh for issuing 'For Construction' drawings with numbers instead of letters?
Have I missed some functionality somewhere?
Link to comment
2 answers to this question
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.