Hi there,
I have a worksheet on the cover sheet (sheet layer) of my drawing set that automatically updates based on the titleblock data of all other sheets within that same file to generate a drawing list. This works great for me. However, my project is now split over two files, one for my suite of plans and the other for my construction details. This is to enable me to have my plans use meters as units and my details use millimetres. Can the titleblock data from my construction details file be pulled into the worksheet in my plans file to create a full drawing list?
If this has been discussed before please point me in the direction of previous discussion. And as always, all help is very much appreciated.
James