Jump to content

clairee

Member
  • Posts

    1
  • Joined

  • Last visited

Everything posted by clairee

  1. One way I split a proposed Planting Schedule that is too long to fit on the sheet is to separate the worksheet into different categories: -proposed trees (ornamental + shade), -shrubs and perennials, -ground covers, -vines, -sod. I edit the worksheet criteria to have it look for the respective specific "MORE DATA - CATEGORY". I did set up my plant symbols' style in different categories too for this classification method to work. For Existing Tree Report, when the site has over 200 trees, the autogenerated tree report just is too long to fit on a 12 x 18 sheet to be legible (6 or 8-pt font). Unless there is a way for me to write a script in the worksheet cell to look for only tree NO. from (e.g. 1-50, 51-100, 101-150 ...), that could work in theory. For now, I just drop the tree report in the design layer and just create viewports and play with the scales to see which is legible.
×
×
  • Create New...