My firm also prefers to develop a project in a hybrid mode. We use basic 3D modeling and BIM and develop the construction level drawings 2D while using viewports from the model as the base. We want to use this same technique for elevations but find the process of cutting a section viewport to sheets, converting to lines and copying to design layer too tedious when we update the model. We have to repeat the entire process every time an update is made. When trying to cut a vertical section to design layer, when the section elevation line is placed outside of the model, ie elevation, it defaults to horizontal section but works fine on sheet layer. Is there a setting somewhere to change this? Or is there an alternative workflow to consider?