Jump to content

paige s.

Member
  • Posts

    3
  • Joined

  • Last visited

Reputation

0 Neutral

Personal Information

  • Location
    United States
  1. Hello - The Vectorworks Redline Status Report is great but is missing some key information for our workflow... "Assigned to" and "assigned by" is necessary information for our remote workflow & collaboration efforts. Is it possible to edit the redline status report? I have not been having luck so far on that front. I have been able to recreate it manually except I have not been able to figure out how to get the manual report to pull closed redlines... Any insight is appreciated.
  2. We experimented with using the Annotation space previously but moved away from it because we felt it added extra steps. ie, make a design change in the design layer and then have to go to a different location to update the associated note... I will look into that, thank you for the hint.
  3. My firm also prefers to develop a project in a hybrid mode. We use basic 3D modeling and BIM and develop the construction level drawings 2D while using viewports from the model as the base. We want to use this same technique for elevations but find the process of cutting a section viewport to sheets, converting to lines and copying to design layer too tedious when we update the model. We have to repeat the entire process every time an update is made. When trying to cut a vertical section to design layer, when the section elevation line is placed outside of the model, ie elevation, it defaults to horizontal section but works fine on sheet layer. Is there a setting somewhere to change this? Or is there an alternative workflow to consider?
×
×
  • Create New...