-
Posts
367 -
Joined
-
Last visited
Content Type
Profiles
Forums
Events
Articles
Marionette
Store
Posts posted by The Hamma
-
-
I am also having slow down problems. I also am using VW 10.1 and converted the file back to 9.5.2 and tried the same sequence of steps to move a wall. using the reshape tool. 9.5.2 took about .5 second and in 10.1 it took about 30 seconds.
I am using Windows 98 SE the file is only about 1.5 Megs and I just restarted windows.
-
the 499 note limit may be true for the data base but try to use the keynote tool when you have more than 250 notes in a database and you will recieve an error
-
Some issues I have with the VW 9.5.2 Keynoting system:
1. the maximum number of notes you can have in the database is 499, but the maximum number of notes the keynote tool can handle is 250, both of which is to small.
2. The label for the keynote should have an option to refer to the keynote name which is given when the note is created. I don't want the type in the label every time and the auto increment feature is not for everybody.
Have either of these issues been addressed in VW 10
and/or are there any intentions to resolve them in VW 9
Vectorworks 10.1 very slow
in General Discussion
Posted
When I select more than a few items ie. 129 objects trying to nudge them takes a very long time. But if I group them, it works fine. We are having this same problem on all six computers. Most of them are running on clean boots and the CPU, Ram, Video, and Motherboards are different on each.