I am having troubles with my room finish schedule perhaps because its to long. I have a 9-story building, around a hundred room names on each floor. The whole schedule is diplaying on my screen, but when I print the last three floors with the corresponding portion of the schedule, the schedule is not printing. Currently, we are creating viewports around the room finish schedule and cropping it to show the correct rooms corresponding to the finish plan on that sheet. Is there a maximum amount of rooms that can go on a schedule, a better way to do this so the end of the schedule will print, or any other ideas to try?