@Pat Stanford thank you! I've made one record in resource manager. I've this record attached to some symbols and I made two materials in resource manager. Also attached the record to the materials. Dragging the symbols in drawing, can read in Worksheet. Made an extrusion with a material, can't read the record from the material.
If this is achievable with a script can you tell me how?
Thanks for quick response!