hi, I were running into problems with the space tool. It seems to me that there is a limit of spaces you can set up, before the
software will get slow. I'm working on a project with 85 apartments/≥ 5 rooms each , where I set up spaces for running a calculation
> Area and costs. For me a normal setup those times, and an essential part of any BIM setup.
The problem is that Vectorworks is so slow, that shifting / activating classes takes 5-10 seconds.
I isolated the spaces in a separate drawing, and since than Vectorworks runs well - but that can't be the solution 2024.
Does anyone has the same problems or can help me with a solution ?
> I work with VW architect, 2024 on Mac.
All the best & thanks _ Axel