Jump to content

duggie-APE

Member
  • Posts

    4
  • Joined

  • Last visited

Reputation

0 Neutral

Personal Information

  • Occupation
    CNC Designer / Technical Supervisior
  • Homepage
    www.apeplayground.com
  • Hobbies
    woodworking
  • Location
    Sarnia, Ontario, CANADA
  1. Hi all, I have a co-worker that is having issues with the cut & paste from the VW worksheet data to the Mac Parallels Excel version. He can copy from VW, but not paste the info into Excel. We have not found any way to check to see if his clipboard is full because it doesn't come up. I am not familiar with MAC's, so any assistance to solve this problem would be appreciated. Thanks, duggie-BKL
  2. Hi all, Another noobie question: When I create a symbol that has multiple parts to it, I group everything together and assign some object data to it before I create the symbol. When I bring the symbol into my drawing, edit and ungroup the symbol, then group it again before saving; I lose the data that I attached to the symbol when I created it. Is this common ?? ... and is there a way to stop it from happening ?? We are losing a lot of information (and money) when this happens because the data is not being picked up by the worksheet. Any assistance would be appreciate ... Thanks, duggie-APE p.s. - We are using VW2011
  3. Thanks for the reply willofmaine I tried that and it worked !!! Thanks again
  4. Hi all, As you can tell from my huge post count, I'm a noob on this forum (and also with VW) so some, or most, of my questions will probably be pretty basic ... please bear with me !! First off, I have a model assembly using 3D components and I need to convert the entire model into a 2D file so it can be converted and inserted into an AutoCAD file. I have looked for the ability to make this conversion, but cannot seem to find anything. Is it possible in VW to do this; do I need a custom script, etc. ?? Any assistance would be appreciated. Thanks, duggie-APE
×
×
  • Create New...