hi, just a quick one I hope
i need to reference 8 door schedule reports into one file which i will then use as my master door schedule (8 storey building - one file for each floor) however when i reference in the layer containing the report worksheet only the top two rows of the worksheets appears, can anyone shed any light on this? i would be most grateful.
best regards
john