I am attempting to set up separate reports for each layer to calculate the walls(i,e concrete footings, then walls, flat work, etc.) total Area in Square feet then Cubic Yards of concrete Material Cost per Square Foot and Total Labor Cost per Square Foot. Can anyone direct me to specific instructions on how to accomplish this task? Thanks!