This tip would be handy for use with the VectorWorks Architect Door Hardware Schedule or Wall Type Schedule. This example uses the Door Hardware Schedule.    After creating a Door Hardware Schedule, select Window > Worksheets > Door Hdw Schedule. Click on the header row cell (the one containing a clear diamond to the left of the row number); this is where the general information for the listed objects is summarized. After selecting the header row cell, the Ascending Sort, Descend