We've been sent a shared datum point for a Revit building model, which has an Easting, Northing, and Elevation. 

 

I have set our Vectorworks internal origin to the (2D) shared datum point... and the model appears in the correct position relative to the site and other base information. 

 

However, I noted that they have specified the elevation of their datum point as 86.34754m. 

 

I want to be able to send them our site model back without them having to move it around or change the elevation, but equally I want to be able to work with proper AOD spot levels.

 

Is there a way to give the internal origin in Vectorworks this height information? Or to specify it on exporting IFC?

  • Like 1
Link to comment

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...