Jump to content

Door Schedule


Recommended Posts

I assigned numbers to my doors but forgot to start with 01,02, etc. Now my schedule reads out of order and even though I went back and changed the number, I can't get the schedule to recalculate in the correct order. It keeps telling me that there is already a schedule that exists in the drawing. I tried deleting it and starting over but that doesn't work. Help!

Link to comment

The door and window schedules in VW's do not automatically sort the identification column when the report is first created. As Ramon said, you need to re-sort the column which is somewhat difficult if you have never attempted it before. Highlight all of the items in the column and then drag down the small sorting icon to enact the desired change. I believe NNA is going to correct this with their next release.

Link to comment

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...