JeroenS. Posted February 22, 2022 Share Posted February 22, 2022 Hi all, I'm having trouble with adding the load of fixtures wich are on top of a truss system. It's neccecary to correcly attach every load since I'm using Braceworks for most of the load calculations. Most of the time I'll fix issues like this by adding point loads, but that's not the most elegant way of doing it. I was wondering, is there another way or is this simply a limitation of the software? Here's screencapture showing the issue: Quote Link to comment
Vectorworks, Inc Employee jcogdell Posted February 22, 2022 Vectorworks, Inc Employee Share Posted February 22, 2022 Hi Jeroen The lights should be attached automatically to the hanging position when you inserted them. What happens when you use the select system object button in the hanging positions properties? What are your auto positioning settings in the Spotlight preferences Loads and rigging pane? Can you send me the file to have a look? Quote Link to comment
JeroenS. Posted February 22, 2022 Author Share Posted February 22, 2022 The objects I'm trying to place on top don't seem to be in the same system. I'll send the file to you in a private message. Quote Link to comment
JeroenS. Posted February 22, 2022 Author Share Posted February 22, 2022 Adjusting the pick radius seemed to do the trick. Thanks for pointing me in the right direction. Quote Link to comment
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.