just went to plot a project and on a stairwell section (6 stories) was amused (not) to find the stairs had gathered together on the 3rd floor for an impromptu party.
stairs were properly on their layer but had shifted in Z either up or down. Visually was humorous in section but had to insist they stay on their floor in the OIP but had to retype a few times.
On a 6 story building with a few stairwells this gets time consuming. I typically configure a staircase on the main floor and copy and pip to successive floors (adjusting the landing floors in the OIP as needed). Its gotten to where I will do this in an iso view to ensure they land where they are supposed to. Is there something in this to imbed the error?
You can post now and register later.
If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.
Question
station
just went to plot a project and on a stairwell section (6 stories) was amused (not) to find the stairs had gathered together on the 3rd floor for an impromptu party.
stairs were properly on their layer but had shifted in Z either up or down. Visually was humorous in section but had to insist they stay on their floor in the OIP but had to retype a few times.
On a 6 story building with a few stairwells this gets time consuming. I typically configure a staircase on the main floor and copy and pip to successive floors (adjusting the landing floors in the OIP as needed). Its gotten to where I will do this in an iso view to ensure they land where they are supposed to. Is there something in this to imbed the error?
thanks
Link to comment
3 answers to this question
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.