Hello All I have a long window schedule that I need to break into smaller sections so it will fit on the sheet. I have figured out how to limit the windows on the schedule to their respective floor layer, ( all of the ground floor windows for example) But I can't figure out is how to duplicate that schedule then edit the criteria to be the next floor level. When I duplicate it and then edit the copy it changes both schedules to the same criteria. Does anyone have any ideas?