Jump to content

Landmark - Asset Management/Data Use


Recommended Posts

We have a client who manages a program of annual/seasonal colour plants in public open spaces.  We design the displays and the plants are in their individual pots within their displays.

 

The Client can obtain data about the performance of the plants during the display - for example the height at a certain week, how many of a particular plant needed replacement etc, if some plants needed extra water, if some plants required less water.

 

We would like to utilise this information to ensure our designs begin to be more robust and so that the client can schedule replacements, extra watering etc better.

 

For instance - if we nominated a bulb and had the data that indicated it needed replacement at week 5 after installation, how could we draught this plant symbol and then produce a report to say to replace them at that week?  Say for instance we nominate a plant which we know needed 10% replaced at week 7 would be another typical senario.

 

 

Link to comment

Sounds like an excellent BIM exercise and application of Data Visualization & Worksheets.

Create a Service Record with all the pertinent information, Attach it to each Plant and fill in the relevant data.

Determine the minimum Service-Time interval and set up a worksheet(s) & Viewport series that looks at and

reports on the relevant Data at each Time Interval.

 

  • Like 3
Link to comment

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...