Jump to content
Sign in to follow this  
jfmarch

Worksheet Schedules

Recommended Posts

Wish list item- When one runs the script creating scheules, the database worksheet run to the bottom row in the worksheet, leaving no room for notes. If I want to add notes or an abbreviation legend, I have to insert a row to the worksheet which interrupts the database. It takes a little doing to set it straight. It would be nice to allow for a couple extra blank roows at the bottom for user use.

------------------

Jim McAuliffe, RA

Share this post


Link to post

quote:

Originally posted by jfmarch:

Wish list item- When one runs the script creating scheules, the database worksheet run to the bottom row in the worksheet, leaving no room for notes. If I want to add notes or an abbreviation legend, I have to insert a row to the worksheet which interrupts the database. It takes a little doing to set it straight. It would be nice to allow for a couple extra blank roows at the bottom for user use.


there shouldn't be a problem with this. Just drag the lower right corner of the database/worksheet and add a few more rows. You can then enter notes in those rows without any problems

Share this post


Link to post

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

 

7150 Riverwood Drive, Columbia, Maryland 21046, USA   |   Contact Us:   410-290-5114

 

© 2018 Vectorworks, Inc. All Rights Reserved. Vectorworks, Inc. is part of the Nemetschek Group.

×