Jump to content
Sign in to follow this  
barkeatr

door schedule

Recommended Posts

I produced a door schedule to see how it works, then I erased it. Now when I call out for another door schedule it does nothing....how can I get the door schedule back?

thanks,

Tim

Share this post


Link to post
Guest

The way to do this is to be in the Architect Workspace, go to the "Notes" menu, select "VA Create Schedule." Once this is done you will want to bring your door record back or update it, depending on if you removed that as well.

To bring a record back is to choose "Show 3D Detail" under the "Model" pull down. This will regenerate all 3D objects and "re"-create the record, attatching all information.

I hope this helps.

------------------

Brian O

Diehl Graphsoft, Inc.

Technical Support

[This message has been edited by Brian O (edited 02-10-2000).]

Share this post


Link to post

Also try going in RESOURCES/your curent drawing/DOOR SCHEDULE highlite and delete; now you permanently deleted the old one.

I found a way faster to delete it permanently than to fix it.

Share this post


Link to post

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Sign in to follow this  

 

7150 Riverwood Drive, Columbia, Maryland 21046, USA   |   Contact Us:   410-290-5114

 

© 2018 Vectorworks, Inc. All Rights Reserved. Vectorworks, Inc. is part of the Nemetschek Group.

×
×
  • Create New...