barkeatr Posted February 10, 2000 Share Posted February 10, 2000 I produced a door schedule to see how it works, then I erased it. Now when I call out for another door schedule it does nothing....how can I get the door schedule back? thanks, Tim Quote Link to comment
Guest Posted February 10, 2000 Share Posted February 10, 2000 The way to do this is to be in the Architect Workspace, go to the "Notes" menu, select "VA Create Schedule." Once this is done you will want to bring your door record back or update it, depending on if you removed that as well. To bring a record back is to choose "Show 3D Detail" under the "Model" pull down. This will regenerate all 3D objects and "re"-create the record, attatching all information. I hope this helps. ------------------ Brian O Diehl Graphsoft, Inc. Technical Support [This message has been edited by Brian O (edited 02-10-2000).] Quote Link to comment
Ves Mandaric Posted February 11, 2000 Share Posted February 11, 2000 Also try going in RESOURCES/your curent drawing/DOOR SCHEDULE highlite and delete; now you permanently deleted the old one. I found a way faster to delete it permanently than to fix it. Quote Link to comment
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.