Jump to content
  • 0

T Horton


T Horton

Question

Using VW 2020.

 

Using the slab and slab drainage tools to model a roof. I've created roof components in the assembly as follows:

 

3" Polyiso at R5.1/inch

4" EPS at R4.04/inch

Based solely on the insulation, that gives me a quick calc of R31, if the roof was flat.

 

I've set the roof drains for a 2% slope with the EPS layer as the "sloped" component.

 

The object info tells me the R value is R39. It must take into account added sloped insulation, but it's not clear. I'm guessing the 4" EPS I set in the assembly is the minimum and it's automatically added insulation to achieve the proper slopes. Can anyone confirm?

Link to comment

0 answers to this question

Recommended Posts

There have been no answers to this question yet

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Answer this question...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...