Irrigation - Turn Off Automatic Irrigation Network Update


Recommended Posts

Is there a way to turn off the  automatic irrigation network update that occurs at every pipe connection? The disruption to workflow with having to wait 5-10 seconds after every single lateral pipe placement is getting to be quite tedious on larger irrigation plans. I cannot find any setting to disable this feature.

I would much prefer to lay out the lateral lines of a zone and calculate the pipes after I have everything laid out. I do not know if this is an issue with my personal workflow, which is as follows (short version):


1. POC Setup

2. Mainline Run

3. Design Zones

3. Head Placement

4. Lateral Line Placement

5. Valve Cluster Placement

 

Should I be approaching my irrigation drafting in a different order? Can I just turn off calculations until I am ready for them?

 

Thank you.

Edited by samgbickel
Link to comment
  • 7 months later...
On 7/7/2020 at 1:13 AM, samgbickel said:

Is there a way to turn off the  automatic irrigation network update that occurs at every pipe connection? The disruption to workflow with having to wait 5-10 seconds after every single lateral pipe placement is getting to be quite tedious on larger irrigation plans. I cannot find any setting to disable this feature.

I would much prefer to lay out the lateral lines on a zone and calculate the pipes after I have everything laid out. I do not know if this is an issue with my personal workflow, which is as follows (short version):


1. POC Setup

2. Mainline Run

3. Design Zones

3. Head Placement

4. Lateral Line Placement

5. Valve Cluster Placement

 

 

Should I be approaching my irrigation drafting in a different order? Can I just turn off calculations until I am ready for them?

 

Thank you.

Hi,

as far as I know there is no option to turn that of but it looks that somene forgot about it... because there is an option to force manual recalculation...

My workflow goes like this:

1. POC Setup - if flow & pressure were mesured

2. Head Placement

3. Design Zones - helps to split zones into valve sections

4. Lateral Line Placement

2. Mainline Run

5. Valve Cluster Placement

6. POC Setup - if flow & pressure is going to be set by the design

Edited by Piotr Karczewski
Link to comment
  • 1 year later...

Let me guess - this is still unresolved by VEctorworks?  Yet another reason we canceled our Service Select membership and are no longer going to update.  These issues effectively make the software unusable.  We have irrigation plans that require waiting hours a day for calculations to complete.  This is unbelievably frustrating.  We are looking for other solutions and possibly will farm out our irrigation work as a result.

  • Sad 1
Link to comment

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...