Jump to content
Markvl

Titleblock Revisions

Recommended Posts

Is there a way to make a revision act like Project Data so that I only need to type out Issued for permit once with a date and similar other items?

Share this post


Link to post

You can add revisions to multiple sheets at the same time using the titleblock manager (button at bottom of oip when TB selected).

Be sure to select your sheets first - bottom left of dialogue.

  • Like 1

Share this post


Link to post

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.


 

7150 Riverwood Drive, Columbia, Maryland 21046, USA   |   Contact Us:   410-290-5114

 

© 2018 Vectorworks, Inc. All Rights Reserved. Vectorworks, Inc. is part of the Nemetschek Group.

×
×
  • Create New...