The back up files generated when using Project Sharing should open as regular .vwx files not .vwxw files.
If I'm opening a back up something is wrong. I don't want it talking to the server .vwxp file making it crash or worse over-righting the back up. I shouldn't need to air-gap my machine to open a backup.
If I do then well copy paste to a working working file is an acceptable trade off.
You can post now and register later.
If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.
Question
Matt Overton
The back up files generated when using Project Sharing should open as regular .vwx files not .vwxw files.
If I'm opening a back up something is wrong. I don't want it talking to the server .vwxp file making it crash or worse over-righting the back up. I shouldn't need to air-gap my machine to open a backup.
If I do then well copy paste to a working working file is an acceptable trade off.
Link to comment
1 answer to this question
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.