Christiaan Posted December 17, 2019 Share Posted December 17, 2019 (edited) I typically want to display slope values as a rise over run (e.g. 1:80) rather than a percentage (e.g. 1.25%). Edited January 27, 2021 by Christiaan 2 Quote Link to comment
0 rDesign Posted December 17, 2019 Share Posted December 17, 2019 (edited) I agree — this should be a user option per Slab object, and not as a single setting for the entire file as there are times when we need to have both % slope and rise/run called out on the same drawing. For example, when dealing with accessibility compliance in the U.S. (clear landing in front of a door) we typically write the slope as 2% MAX. But when are dealing with the slope of a ramp or walkway, we typically call it out as rise / run like 1:12 or 1:20. Edited December 18, 2019 by rDesign 1 Quote Link to comment
0 mike m oz Posted December 18, 2019 Share Posted December 18, 2019 It would be better to have both methods and let the users choose which method they want to use. 2 Quote Link to comment
0 Christiaan Posted January 27, 2021 Author Share Posted January 27, 2021 Added to JIRA: VE-101537 Quote Link to comment
Question
Christiaan
I typically want to display slope values as a rise over run (e.g. 1:80) rather than a percentage (e.g. 1.25%).
Edited by ChristiaanLink to comment
3 answers to this question
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.