Jump to content
  • 4

Ability to show slab drainage slope values as rise over run


Christiaan

Question

3 answers to this question

Recommended Posts

  • 0

I agree — this should be a user option per Slab object, and not as a single setting for the entire file as there are times when we need to have both % slope and rise/run called out on the same drawing.
 

For example, when dealing with accessibility compliance in the U.S. (clear landing in front of a door) we typically write the slope as 2% MAX.
 

But when are dealing with the slope of a ramp or walkway, we typically call it out as rise / run like 1:12 or 1:20.

Edited by rDesign
  • Like 1
Link to comment

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Answer this question...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...