Jump to content
  • 1
Amorphous - Julian

Faster Sheet Layer Operation (Rename, Delete Sheet)

Question

Currently, modifying sheets layers (renaming them, or to delete, or create new sheet) take very long. 
We need this operation to be snappy. No one should be sitting in front of a computer watching a spinning beach ball. 

See video enclosed. 

My main concern with speed pertains to deleting sheets, which took 45 seconds in the video ( 0:01- 0:46 )

I am perhaps going to get the answer 'you will begin to see this if your document is exceeds xxx sheets'.

But projects inevitably comes in big and small sizes- and it is on big projects that we particularly need the efficiency of speed. 

Share this post


Link to post

2 answers to this question

Recommended Posts

  • 0

Julian, was this with Vectorworks 2020? If you could send me the test file, I would like to investigate why this is so slow. You can send it to bruce@vectorworks.net.

Share this post


Link to post

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Answer this question...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.


 

7150 Riverwood Drive, Columbia, Maryland 21046, USA   |   Contact Us:   410-290-5114

 

© 2018 Vectorworks, Inc. All Rights Reserved. Vectorworks, Inc. is part of the Nemetschek Group.

×
×
  • Create New...