Jump to content

Scheduling Material Volumes


Recommended Posts

Hi All, 

We are doing a pre-demolition survey for a project and need to provide a schedule of all the demolition material separated into material groups for BREEAM accreditation. 

We have a detailed IFC model from the surveyor which I can fairly easily get volumetric quantities from and have separated each of the elements into material classes (eg. masonry walls, stud walls, timber panelling) however I wanted to know if I can schedule out elements embedded in each IFC object separately.
As an example, a door that has timber framing and glazed panels - I want the schedule to list each of these items based on their class however unless I explode the object into multiple objects I can't seem to get it to show up. 

 

Any help would be greatly appreciated. 

Link to comment

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...