SITE MODEL SLOPE ANALYSIS


Recommended Posts

Hello, still new to Vectorworks, and trying to create a SITE MODEL SLOPE ANALYSIS REPORT from the 3d grid colored slopes. I can't seem to get the area for each slope range. I managed to create on from the 2d colored slopes but I think its not grid based, and I get weird areas. How can I get a report like this one, but based on the 3d grid colored slopes? Or what is it that this preformatted report is counting in the "projected area" and why am I getting such big amounts of square meters?

image.thumb.png.cb534c07c2876ccdf0a36b0bd1ba5d17.png

 

This is the site I want a report on. I have the colored slope grid, but how can I add the area depending on the color? 

image.thumb.png.8ffd1c249cb498678be2bec4ed508eac.png

Link to comment

My guess is that it is not square meters, but rather square millimeters.

 

My suggestion would be to draw a very simple site model in a new blank file and try the slope analysis on that. Something that is simple enough that you can manually calculate the area and see if you can  figure out the required conversion factor.

 

Once you have the database of all of the slopes, you will use the SUMMARIZE function on the Color column to collapse them into a single summarized subrow. Click on the disclosure triangle on the database header row (3, not 3.1, 3.2, etc. If you don't see the header row, go to the worksheet View menu and make sure Database headers is checked.) and check the Summarize Items  check box. You probably also need to check the Sum Values check box to get the total for all of the Summarized subrows.

  • Like 2
Link to comment
  • Vectorworks, Inc Employee

Looking at this, the report you're using reports on a record called Site Model Slope Analysis. The field that contains the data does seem to store the information in square millimeters regardless of the unit setting of the file. Therefore, to get the value to display cubic meters, it needs to be divided by 1000000, like this: =('Site Model Slope Analysis'.'Projected Area')/1000000 

 

I am now going to look closer at the data and see if it updates depending on the style you've chosen... I'll report back!

  • Like 2
Link to comment
  • 3 months later...
On 5/1/2019 at 4:01 AM, Tamsin Slatter said:

Looking at this, the report you're using reports on a record called Site Model Slope Analysis. The field that contains the data does seem to store the information in square millimeters regardless of the unit setting of the file. Therefore, to get the value to display cubic meters, it needs to be divided by 1000000, like this: =('Site Model Slope Analysis'.'Projected Area')/1000000 

 

I am now going to look closer at the data and see if it updates depending on the style you've chosen... I'll report back!

Any verdict?

Link to comment
  • 1 year later...

Could someone tell me why my slope worksheet has no colors?  I just dragged the preformatted 'Site Slope Analysis' worksheet onto my drawing and it doesn't seem to be working.  Do I need to edit the worksheet (shown below).  Can't seem to find any specifics on using this worksheet.  Please direct me to them if they exist.

 

Thanks in advance.

Slope analysis no colors.png

Link to comment

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...