CraigC Posted April 23, 2019 Share Posted April 23, 2019 What is the VW workflow for handling existing, demolition, and new construction? Does VW utilize phases? Do you actually model the existing, then demolish the elements being removed, then model the new construction and then somehow it is all retained and displayed by visibility controls in various viewports? Or is this all done with simple 2-D line work? Quote Link to comment
Guest SMannVW Posted April 23, 2019 Share Posted April 23, 2019 This often depends on the scope of work, project budget, and level of detail needed for submittals, consultant coordination, and construction documents. I normally create an as-built model from surveys and/or measurements. I'll save that model for reference and create a copy of it to build a demo model with a set of demo classes that can be turned on and off. Finally, I'll create a new construction model and reference the demo model into the new construction file. Quote Link to comment
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.