digitalcarbon Posted January 10, 2019 Share Posted January 10, 2019 In the end, the ultimate cad system will manage, not buildings as in a BiM manager, but parts...all buildings/facilities are made up of parts....(vendor, fabricated or field installed {pipe cut to length})....THEN locating these parts to a project grid which is then located in relation to the UTM grid... This is the core...flashy presentations & renderings can only get you so far. Quote Link to comment
digitalcarbon Posted January 10, 2019 Author Share Posted January 10, 2019 (edited) then managing those parts through TIME...everything arriving at the right time... Flashy presentation capture attention, but the very next question is "What is the cost?" The grand canyon of time between those 2 items (capturing attention and stating cost) needs to be closed. Edited January 10, 2019 by digitalcarbon Quote Link to comment
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.