Jump to content
  • 0

Door Schedule Prefix?


archdaly

Question

10 answers to this question

Recommended Posts

  • 0

Archdaly,

 

I assume that you tried to type directly into the worksheet.

Try selecting the door and then in the OIP - click on "Settings" 

In the settings, select the "Data" tab at the bottom of the list and try and enter your data there.

 

If that doesn't work, the doors may be styled - so that they all retain the same labeling ...

 

If you post an example file with that schedule in it, we may be able to figure out what is going on.

 

Link to comment
  • 0

Thanks Taproot... the screenshot that I uploaded is what I'm referring to. I have modified the data field for the door to simply have "WD" and not HMWD. Editing the worksheet directly works as well to change the suffix but the HM remains regardless of what I input into the field. 

 

Doors are all unstyled... 

Link to comment
  • 0

Archdaly,

 

Those two columns appear to be corrupted.  I was able to solve the problem by creating two new columns and then copying and pasting your original criteria (in the database header row) to them.

 

Attached is your test file with that update.  The original two columns are shaded - you can delete them.  The working columns are unshaded.

 

Cheers.

 

TEST2.vwx

Link to comment

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Answer this question...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...