Jump to content
  • 0

Problems sending items to back or to front


AndreaFC

Question

4 answers to this question

Recommended Posts

  • 0

I am noticing that this seems to be to do with the object type. For example I can order one polygon relative to another but I can't order a polygon relative to text or a line object. At the moment it is such that all my polygons are on top, followed by text, followed by line objects. I've tried everything even redrawing objects but nothing works. Interestingly, although on my construction layer the objects are incorrectly ordered ie my polygon is on top of my text, in my layout layer the objects are correctly ordered ie the text is on top of my polygon. I have updated the viewport so no idea why it would be different on the layout layer compared to the construction layer.

Link to comment
  • 0

(Letting Layers aside)

I never fully understand how Object Stacking order really works in VW.

 

I also think that a CMD+B "send to Back"

isn't always as "back" as "Back" could be or an "ultimate Back".

For me it is more like a "soft Back"

(It might be a Back or lowest bottom of stacking order in a Class or

something like that)

 

Following that,

I think I was always able to finally send my Floor Slabs behind, to no more

occlude the rest of the Geometry,

but that may need a middle 2 digit number of CMD+B hammering.

Link to comment

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Answer this question...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...